With over 15 years of experience in the production and sales of ground anchoring and mining support products, we operate our own rock bolt and accessory manufacturing facility with stable large-scale production capacity. We are specialists in rock bolts, resin cartridges, anchor cables, bearing plates, and customized ground anchoring products for mining support and geotechnical anchoring solutions.
Two quotations can describe threaded hollow rods, but still cover different installation tasks. One suggestion may be a self drilling system. Another possibility is to insert hollow bolts after drilling separate support holes.
For tunnel contractors, this difference will affect the component list, equipment interfaces, and questions that need to be answered before purchase. The investigation of 'hollow anchor rods' alone leaves too much room for explanation.
The use of pre drilled hollow anchor rods in this article refers to hollow anchor rods used to insert support holes into individual boreholes. Consider it as a description of installation arrangements and require each supplier to identify the actual products and methods behind their terminology.

In the self drilling device, the hollow rod forms a part of the drill string, moves forward with the drill bit, and remains as steel bars. In the pre drilling arrangement discussed here, separate drilling equipment forms holes before inserting hollow bolts.
Even if manufacturers use the relevant rod series in both arrangements, this distinction is still important. A rod with similar appearance is not sufficient to prove that the proposed product is suitable for the same drilling and installation tasks.
Before discussing the price, provide the supplier with the specified installation method and request confirmation based on the proposed product drawings. If the project documents are unclear, please submit the issue to the project's technical team instead of letting the quotation determine the method.
Use the table below to organize supplier discussions. This is a procurement comparison, not a design selection rule.
| Point to confirm | Self-drilling arrangement | Pre-drilled hollow-core arrangement |
|---|---|---|
| How the hole is formed | The hollow bar participates in drilling | A separate drilling operation forms the hole |
| Bar function during drilling | Part of the drilling string and retained reinforcement | Inserted after the hole has been drilled |
| Drill-bit scope | Confirm the compatible bit supplied with the system | Confirm the separate drilling-tool scope and bolt-end configuration |
| Connections and head components | Identify the matching couplers, adapters, plate and nut required | Identify the connections, plate and nut required for the proposed bolt |
| Injection arrangement | Confirm the specified materials, equipment and sequence | Confirm the specified materials, equipment and sequence |
| Evidence for purchase review | Request data for the complete proposed configuration | Request data for the complete proposed configuration |

The above installation differences follow the product descriptions of Epiroc's self drilling and hollow series; The remaining lines are purchase checks used to address proposed configuration issues.
Suppliers may use terms such as self drilling anchors, hollow rods, injection bolts, or hollow bolts in different product ranges. Check the installation instructions and component list, rather than treating these names as interchangeable.
When contacting suppliers of self drilling anchor rods or hollow anchor rods, please confirm the specified drawing version and product characteristics.
Request confirmation:
Separate the required values from the values provided by the supplier. A response that only lists product series or nominal sizes cannot clearly determine what will be delivered.
Also ask what each performance document covers. Does it describe the rod, connection, component, or installed element? Record these differences so that the project team can evaluate the evidence according to their requirements.
If an alternative model is provided, please request a separate proposal and clearly list its differences. Do not merge it with the specified project quotation.
For the self drilling anchor system, the drill bit is an important component of the proposed supply package. The manufacturer's catalog provides different types of drill bits for different ground conditions, so it is necessary to check the drill bit configuration according to project requirements.

Request the proposed drill bit identification and drawings, and inquire about how it can be connected to the designated rod. If the bit selection is still unresolved, please determine who will review it and what ground information is needed.
The connection also deserves the same attention. Require suppliers to distinguish between rod type extension couplings and adapters used on drilling equipment. Identify each item on the parts list, including whether it is supplied as part of the order.
The equipment discussion should determine the actual drilling rig and related tools. Request written clarification on the required equipment and injection interfaces. The statement that a system is "suitable for ordinary drilling rigs" does not provide a specific connection.
For pre drilling options, confirm which party provides separate drilling tools and what equipment is required to insert and inject the proposed bolts. Removing a point from the supply list alone does not establish a complete installation package.
Self drilling describes the drilling function of the system. The quotation should also specify the proposed injection materials and installation instructions applicable to the provided configuration. The manufacturer's instructions include different flushing and injection arrangements, which should be checked for the selected product.
Send relevant project requirements and request suppliers to confirm:
If the quotation mentions one-time drilling and grouting, please inquire about what the statement includes and whether other stages are specified. Do not interpret a brief product description as a complete construction plan.
The mixing ratio, operation settings, installation steps, and acceptance criteria should be addressed through approved project documents and instructions for the selected system. They should not be provided by a universal procurement list.
Before placing an order, please provide a schedule itemized instead of a single line of "hollow bolts"
| Supply item | Confirmation to request |
|---|---|
| Hollow bars | Exact model, length, finish, quantity and applicable drawing |
| Drill bits | Whether required for the proposed arrangement, and the specified type and quantity |
| Couplers | Matching bar reference, connection details and quantity |
| Nuts and bearing plates | Required arrangement, dimensions and quantities |
| Adapters and injection accessories | Item identification, interfaces and supply responsibility |
| Technical documents | Drawings, product data, installation instructions and available test records |
| Packing and identification | How components will be labeled and matched to the order |
Mark each item as included, excluded, or priced separately. Ask who is responsible for resolving any interfaces between projects provided by different parties.
Compare the quotation with the same schedule. The price including only rods and the price including drill bits, couplers, plates, and documents represent different supply ranges. Confirm technical configuration before evaluating business differences.

End the discussion with a brief confirmation note:
If changing from pre drilling arrangement to self drilling arrangement, or vice versa, please clearly describe the proposed changes. Obtain technical review of the change from the project, rather than treating it as a substitute for similar procurement.
The comparison should answer whether the provided configuration matches the installation task of the project. It should not assume that any system is always stronger, faster, or cheaper.
Send the specified installation method, relevant drawings, reinforcement and connection requirements, component quantity, and delivery destination to CQ Rockbolt. Include a list of documents required for project review.
A concise survey can illustrate:
Please refer to the designated [self drilling/pre drilling hollow] layout shown in the attached document. Determine the proposed drill rod, required drill bit configuration, couplings, head components, and injection fittings. List excluded items, deviations, and available technical records separately.
Before finalizing the order, please confirm with CQ Rockbolt which available products, components, and documents can address the inquiry.
Other news you might be interested in

A request for “rock bolts for a tunnel project” leaves the supplier with several unanswered questions. Which bolt system is specified? Does the quantity cover bars alone or complete assemblies? Is delivery required at a U.S. port, a warehouse or the jobsite?A useful request for quotation, or RFQ, gives rock bolt suppliers enough information to price the same scope and identify anything they cannot confirm. For the contractor, it also makes technical differences, missing accessories and delivery assumptions easier to compare before an order is placed.

Coal mine roadways are essential to safe, continuous underground operations. Their stability can be affected by changing geological conditions, mining-induced stress and excavation activity. As ground-control research increasingly focuses on the overall coordination and monitoring of support systems, rock bolts, W-straps, mesh and cable bolts should not be viewed as isolated components, but as elements that work together under site-specific mine conditions. This article explores their complementary roles in coal mine roadway support, while recognizing that support designs must be based on the conditions of each mine.